From: SourceForge.net <no...@so...> - 2006-04-28 17:56:52
|
Read and respond to this message at: https://sourceforge.net/forum/message.php?msg_id=3706139 By: nobody Recently I checked the source code of BarabasiAlbertGenerator.java. "The At a given timestep, the probability p of creating an edge between an existing vertex v and the newly added vertex is p = (degree(v) + 1) / (|E| + |V|); " This method is extended from original one p = degree(v) / |E| in Barabasiâs paper However, I think above expression is correct only for directed graph, and for the undirected graph the computation method should be p = (degree(v) + 1) / (2*|E| + |V|); and it is original form is p = degree(v) / 2*|E| Anyone also check this problem? ______________________________________________________________________ You are receiving this email because you elected to monitor this forum. To stop monitoring this forum, login to SourceForge.net and visit: https://sourceforge.net/forum/unmonitor.php?forum_id=252062 |