From: John W. <ca...@mm...> - 2009-05-11 20:40:19
|
Hi Curt, Took the liberty to talk to the folks at Red Bird, Todd (spelling?) in particular. explained our relationship, etc, etc. One of the items for your gap study to consider is how to handle the hardware interfacing, especially if they want to use the "modular" approach. My questions focused around this idea. Personally, I don't like their engineering solution but suspect it was driven in large part by the use of MSFS and the Garmin plug-in emulators and having to fit into that world. At any rate, following are my suggestions for the gap study some of which we discussed: 1) porting FG to run on a multi-core machine with multiple displays with OSG with an emphasis on the frame rate 2) number and types of subsystem models required. I would avoid scripting and xml stuff except as required for sim stratup and initialization; i.e. no run time scripts or xml logic ( again emphasis is on frame rate ) 3) where to do the hardware interfacing? this might be a small engineering study funded by Red Bird; e.g given that we have a basic Avidyne display for the SR-22 do we build the interface there or perhaps a "personality" package that talks directly to FlightGear. Sort of depends on modeling question in #2. For NASA these models are in the LFS private stuff, avoids the question of GPL and having to publish the source and provides better control over the source. But you've been down that road with ATC. Putting the models in the Avidyne/Garmin/whatever code meets that objective. 4) it does sound like they've invested some time and effort into their "plexiglass" solution with a little pride of authorship. But thinking we could build an LFS prototype for the Avidyne under some form of a cost-sharing and licensing arrangement and show life-cycle costing benefits and better quality and customer appeal. 5) finally, the nav database question. we have software to create flightplans and incorporate SIDS and STARS based on Robin's database. If they want to use something like Jeppsen about all that is required would be rewritting the parser to extract the specifics. Well, that's my $0.02. The NASA support contract starts this week and suspect Ron and Glenn will be calling with a bunch of pent up questions and requests. If you want comments on the study report, fire off a draft and I'll pass along my thoughts. Regards Jack |