When I try to copy a machine in synthesis view, into a new project, then I can copy everything but the variables. I guess I should be able to select the whole machine and copy paste it into a new project.
This Tracker item was closed automatically by the system. It was
previously set to a Pending status, and the original submitter
did not respond within 14 days (the time period specified by
the administrator of this Tracker).
If you would like to refer to this comment somewhere else in this project, copy and paste the following link:
Jenny, I've tried this with the latest release (0.9.0) of the platform and didn't have any problem with copying variables.
Could you please check if you still have this problem?
This Tracker item was closed automatically by the system. It was
previously set to a Pending status, and the original submitter
did not respond within 14 days (the time period specified by
the administrator of this Tracker).