| Name | Modified | Size | Downloads / Week |
|---|---|---|---|
| Parent folder | |||
| dpp_v2_5_4.zip | 2018-10-03 | 73.5 MB | |
| dpp_v2_5_3.zip | 2017-08-26 | 65.0 MB | |
| dpp_v2_5_2.zip | 2017-05-04 | 24.9 MB | |
| dpp_v2_5_1.zip | 2017-04-22 | 24.4 MB | |
| dpp_v2_5.zip | 2017-03-10 | 51.8 MB | |
| dpp_v2_2.zip | 2016-08-21 | 51.7 MB | |
| dpp_v2_1.zip | 2016-06-11 | 24.8 MB | |
| readme.txt | 2016-06-11 | 1.7 kB | |
| demo_pre_config.zip | 2016-06-11 | 30.0 MB | |
| readme | 2016-03-10 | 1.6 kB | |
| dpp_v2.zip | 2015-08-24 | 29.7 MB | |
| dotproject+_usability.zip | 2014-10-29 | 126.4 kB | |
| dotproject+_v1.2.zip | 2014-06-11 | 29.0 MB | |
| integrated_modules_v1.1.zip | 2014-04-13 | 28.8 MB | |
| integrated_modules_v1.0.zip | 2014-01-16 | 29.0 MB | |
| timeplanning-v.2.0.zip | 2013-01-28 | 1.2 MB | |
| monitoringandcontrol_v1.1.zip | 2012-12-04 | 6.1 MB | |
| initiating_v1.1.zip | 2012-12-04 | 15.9 kB | |
| communication.zip | 2012-11-14 | 18.9 kB | |
| Costs.rar | 2012-11-09 | 31.2 kB | |
| monitoring_and_controlling_v1.0.zip | 2012-08-16 | 6.2 MB | |
| initiating.rar | 2012-07-21 | 14.9 kB | |
| risks.rar | 2012-06-28 | 25.1 kB | |
| human_resources.rar | 2012-06-28 | 10.3 MB | |
| project_closure.rar | 2012-06-28 | 17.1 kB | |
| TimePlanning-v.1.0.rar | 2012-04-28 | 7.5 MB | |
| Totals: 26 Items | 494.1 MB | 3 | |
Project website: http://www.gqs.ufsc.br/evolution-of-dotproject/ For doubts or requesting access to a demo installation enter in contact with: rafael.q.g@hotmail.com (Rafael Queiroz Gonçalves) This folder contains a set of modules developed to provide support to the project management best practices, based on PMBOK processes and some CMMI-DEV processes areas. These add-on modules can be installed without impact in the functionalities of other modules. In some cases, it provides interfaces that manipulate data from dotProject core tables, aiming to provide smooth ways to register the project data. The dpp_v2.1 package is the most updated download, and contains all other modules, with improvements and bug fix from previous releases. Improvements were made to make the integration among the modules better, as a central menu to access all features, and the possibility to print the "project plan", which is printed in PDF format, containing sections for each individual planning: scope, time, cost, risk, human resources, acquisitions, communication, quality, and stakeholder. The installation order for the containing modules is: 1. Initiating 2. Stakeholder 3. Time planning 4. Risks planning 5. Human Resources 6. Costs planning 7. Communication 8. Monitoring and controlling 9. Closing We also have a custom theme, providing a more modern and usable user interface. Project website: http://www.gqs.ufsc.br/evolution-of-dotproject/ In case you have difficulties to perform the installation, you may request access to a demo version already installed on the cloud, entering in contact with: rafael.q.g@hotmail.com (Rafael Queiroz Gonçalves).