From: Michael P. <mpatzer@Dunkel.de> - 2010-06-17 11:33:11
|
Hi, I've enabled "Rerun Failed Levels" on a job that does "VirtualFull". But after VirtualFull fails, the Job is Rerun as normal Full. Same behaviour with "Reschedule On Error". A "VirtualFull" is rerun als normal "Full". Is that desired or a bug? Running Bacula 5.0.2 thx ____________________________________ Michael Patzer Network and Security Engineer |