Audience
Traffic Management solution that helps governments to control traffic light signals at isolated junctions
About MOVA
MOVA is designed to cater for the full range of traffic conditions, from very low flows through to a junction that is overloaded. For the major part of the range – before congestion occurs, MOVA operates in a delay minimising mode; if any approach becomes overloaded, the system switches to a capacity maximising procedure. MOVA is also able to operate at a wide range of junctions, from the very simple ‘shuttle-working’, to large, multi-phase multi-lane sites. Sites experiencing capacity difficulties under VA control with congestion on one or more approaches. Where additional capacity is required to allow pedestrian facilities or safer staging structure to be introduced. MOVA is being used by almost all Authorities who have responsibility for traffic signals, and is a requirement on new signal installations and major refurbishments on trunk roads.