ControlSTGE Automation and Controls
|
OpenFASTNational Renewable Energy Laboratory
|
|||||
Related Products
|
||||||
About
Complete process and safety integrity level control across the power and manufacturing industry. Single tool for all power applications, including excitation, power conversion, static start and process. Designed for productivity with drag and drop, many to one, and logic to HMI editing. GE’s advanced ControlST software suite provides foundation for the Mark* VIe Control System in a wide range of applications, including control, safety integrity level, monitoring, and protection of everything from turbine-generators to entire plants across all thermal, oil and gas, wind, and solar applications. Combining the best attributes of rotating machinery control with balance-of-plant control, the ControlST software suite offers flexible tools with a common time-coherent dataset to simplify operation and reduce lifecycle cost. In addition, it supports the latest model-based control technology derived from GE’s thermodynamic design models to deliver the performance, operability, and reliability.
|
About
OpenFAST is an open source wind turbine simulation tool developed by the National Renewable Energy Laboratory (NREL). It builds upon the FAST v8 code, integrating aerodynamics, hydrodynamics, control systems, and structural dynamics to enable comprehensive, coupled nonlinear aero-hydro-servo-elastic time-domain simulations of wind turbines. OpenFAST supports various configurations, including land-based, fixed-bottom offshore, and floating offshore turbines. The platform aims to foster an open source developer community across research laboratories, industry, and academia, providing a robust software engineering framework with well-documented source code, automated testing, and a multi-platform build system. Key organizational changes from FAST v8.16 to OpenFAST include the establishment of a new GitHub repository consolidating glue codes, modules, and compiling tools; updated version numbering; and the introduction of unit testing at the subroutine level.
|
|||||
Platforms Supported
Windows
Supported
Mac
Not Supported
Linux
Not Supported
Cloud
Supported
On-Premises
Not Supported
iPhone
Not Supported
iPad
Not Supported
Android
Not Supported
Chromebook
Not Supported
|
Platforms Supported
Windows
Supported
Mac
Supported
Linux
Supported
Cloud
Not Supported
On-Premises
Not Supported
iPhone
Not Supported
iPad
Not Supported
Android
Not Supported
Chromebook
Not Supported
|
|||||
Audience
Companies within the manufacturing industry looking for a process and safety integrity level control solution
|
Audience
Wind energy researchers, engineers, and developers requiring a tool for simulating the dynamic response of various wind turbine configurations
|
|||||
Support
Phone Support
Supported
24/7 Live Support
Not Supported
Online
Supported
|
Support
Phone Support
Supported
24/7 Live Support
Not Supported
Online
Supported
|
|||||
API
Offers API
Not Supported
|
API
Offers API
Not Supported
|
|||||
Screenshots and Videos |
Screenshots and Videos |
|||||
Pricing
No information available.
Free Version
Not Supported
Free Trial
Not Supported
|
Pricing
Free
Free Version
Supported
Free Trial
Not Supported
|
|||||
Reviews/
|
Reviews/
|
|||||
Training
Documentation
Supported
Webinars
Not Supported
Live Online
Not Supported
In Person
Supported
|
Training
Documentation
Supported
Webinars
Not Supported
Live Online
Not Supported
In Person
Supported
|
|||||
Company InformationGE Automation and Controls
Founded: 1892
United States
www.ge.com/power/gas/controls/controlst-software
|
Company InformationNational Renewable Energy Laboratory
United States
www2.nrel.gov/wind/nwtc/openfast
|
|||||
Alternatives |
Alternatives |
|||||
|
|
|
|||||
|
|
||||||
|
|
||||||
Categories |
Categories |
|||||
Oil and Gas Features
Compliance Management
Not Supported
Equipment Management
Not Supported
Inventory Management
Not Supported
Job Costing
Not Supported
Logistics Management
Not Supported
Maintenance Management
Supported
Material Management
Not Supported
Project Management
Not Supported
Resource Management
Not Supported
Scheduling
Not Supported
Work Order Management
Not Supported
|
||||||
Integrations
DataHUB+
Not Supported
OPUS
Not Supported
|
||||||
|
|
|