From: muthu <map...@gm...> - 2014-02-03 23:29:44
|
Team, Next important feature I would like to suggest for development in WebERP is that introduction of Quality Control (Material Inspection). This feature can be introduced in the following stages. 1) On Receipt of Material in Store and 2) During every operation of manufacturing order While first can be introduced immediately after GRN process, the second option can be introduced only after building the features like Routing operation, and followed by "Production Entry to Work Order and Movement". Inspection after Receipt of Material in Store: In every industry, material inspection is an important activity which needs to be carried out at first while the material in dock and before the same is taken into stock for further consumption. In the current WebERP flow, once we receive the order the material directly gets into stock without any quality check. I can think through the following sequence of process for everyone to come out with their suggestions/inputs. 1) Introduce New Inspection Locations (to receive the material) using the Locations.php option (Inward, Main Store, Rejection, Rework, Scrap) 2) Develop a new Quality Control/Material Inspection Maintenance program a) Program will get the input as PO Number/ GRN No b) Display the material against the PO/GRN c) Provide the following options to Quality Inspector to classify the receipt qty based on their inspection. i. Received Qty, ii. Accepted Qty, iii. Rejected Qty, iv.Rework Qty, v. Scrap Qty d) Provide Comments Section to articulate the reason for the rejection/rework/scrap e) On Submission, move the accepted quantities to main warehouse respective location (which we need to specify in the item master, feature currently not available - needs to be confirmed) and other quantities to respective locations i.e. in case of scrap move to scrap location. f) Provide Option to Print the GIIR (Goods Inward & Inspection Report) 3) Develop the required consolidated reporting options like vendor wise rejection, item wise rejection reports for the date ranges. Let me know if you need any additional information in this regard. Regards, Muthu |
From: Phil D. <ph...@lo...> - 2014-02-04 00:25:19
|
<!DOCTYPE html PUBLIC "-//W3C//DTD XHTML 1.0 Strict//EN" "http://www.w3.org/TR/xhtml1/DTD/xhtml1-strict.dtd"><html xmlns="http://www.w3.org/1999/xhtml"><head> <meta content="text/html; charset=UTF-8" http-equiv="Content-Type"/> <style type="text/css">.mceResizeHandle {position: absolute;border: 1px solid black;background: #FFF;width: 5px;height: 5px;z-index: 10000}.mceResizeHandle:hover {background: #000}img[data-mce-selected] {outline: 1px solid black}img.mceClonedResizable, table.mceClonedResizable {position: absolute;outline: 1px dashed black;opacity: .5;z-index: 10000} </style></head><body style=""> <div> I am not sure about inspection locations... and we need to be mindful of those businesses who do not need/want inspection on goods received. </div> <div>   </div> <div> I think a new flag in the stockmaster for inspection required and an extension of the category properties with an inspection criteria flag on the properties. When the item comes up for entry of receipt of the goods the inspection criteria defined for it appear and need to be ticked before the goods can be receipted. </div> <div>   </div> <div> I know you have added the operation sequence ... but this is not actually used in any reports anywhere. If no reports are modified then I can't see why it was necessary? </div> <div>   </div> <div> Thanks </div> <div>   </div> <div>   </div> <div> > On February 4, 2014 at 12:29 PM muthu <map...@gm...> wrote: <br/>> <br/>> Team, <br/>> <br/>> Next important feature I would like to suggest for development in WebERP is <br/>> that introduction of Quality Control (Material Inspection). This feature can <br/>> be introduced in the following stages. <br/>> <br/>> 1) On Receipt of Material in Store and <br/>> 2) During every operation of manufacturing order <br/>> <br/>> While first can be introduced immediately after GRN process, the second <br/>> option can be introduced only after building the features like Routing <br/>> operation, and followed by "Production Entry to Work Order and Movement". <br/>> <br/>> Inspection after Receipt of Material in Store: <br/>> In every industry, material inspection is an important activity which needs <br/>> to be carried out at first while the material in dock and before the same is <br/>> taken into stock for further consumption. In the current WebERP flow, once <br/>> we receive the order the material directly gets into stock without any <br/>> quality check. <br/>> <br/>> I can think through the following sequence of process for everyone to come <br/>> out with their suggestions/inputs. <br/>> <br/>> 1) Introduce New Inspection Locations (to receive the material) using the <br/>> Locations.php option (Inward, Main Store, Rejection, Rework, Scrap) <br/>> 2) Develop a new Quality Control/Material Inspection Maintenance program <br/>> a) Program will get the input as PO Number/ GRN No <br/>> b) Display the material against the PO/GRN <br/>> c) Provide the following options to Quality Inspector to classify <br/>> the receipt qty based on their inspection. <br/>> i. Received Qty, <br/>> ii. Accepted Qty, <br/>> iii. Rejected Qty, <br/>> iv.Rework Qty, <br/>> v. Scrap Qty <br/>> d) Provide Comments Section to articulate the reason for the <br/>> rejection/rework/scrap <br/>> e) On Submission, move the accepted quantities to main warehouse <br/>> respective location (which we need to specify in the item master, feature <br/>> currently not available - needs to be confirmed) and other <br/>> quantities to respective locations i.e. in case of scrap move to scrap <br/>> location. <br/>> f) Provide Option to Print the GIIR (Goods Inward & Inspection <br/>> Report) <br/>> <br/>> 3) Develop the required consolidated reporting options like vendor wise <br/>> rejection, item wise rejection reports for the date ranges. <br/>> <br/>> Let me know if you need any additional information in this regard. <br/>> <br/>> Regards, Muthu <br/>> <br/>> <br/>> ------------------------------------------------------------------------------ <br/>> Managing the Performance of Cloud-Based Applications <br/>> Take advantage of what the Cloud has to offer - Avoid Common Pitfalls. <br/>> Read the Whitepaper. <br/>> http://pubads.g.doubleclick.net/gampad/clk?id=121051231&iu=/4140/ostg.clktrk <br/>> _______________________________________________ <br/>> Web-erp-developers mailing list <br/>> Web...@li... <br/>> https://lists.sourceforge.net/lists/listinfo/web-erp-developers </div> <div id="ox-signature"> Phil <br/> <br/>Ph: +64 (0)275 567890 <br/>Skype: daintree <br/>http://www.logicworks.co.nz </div> </body></html> |
From: opto <bu...@op...> - 2014-02-04 06:50:28
|
1) operations sequence: screens should order by sequrnce number, if requested 2) inspection: should be selected item wise, not company wise, with a company default setting. More important than having formalised inspection, in my opinioun, is handling of returns, for customer and vendor, items, repair, rma etc. I would prefer that before inspection, otherwise, what do we do with the rejected items? my 2 ct, Klaus -- View this message in context: http://weberp-accounting.1478800.n4.nabble.com/Future-Suggestion-Quality-Control-Features-tp4657217p4657219.html Sent from the web-ERP-developers mailing list archive at Nabble.com. |
From: ExsonQu <hex...@gm...> - 2014-03-23 15:21:13
|
*Hi, Muthu,* Thank you for your great proposals. Any progress for the BOM sequences no project? Or do you have any plan about it? I'd like to improve this parts with you and quality control parts too. Best regards! Exson -- View this message in context: http://weberp-accounting.1478800.n4.nabble.com/Future-Suggestion-Quality-Control-Features-tp4657217p4657279.html Sent from the web-ERP-developers mailing list archive at Nabble.com. |