From: muthu <map...@gm...> - 2014-02-03 23:29:44
|
Team, Next important feature I would like to suggest for development in WebERP is that introduction of Quality Control (Material Inspection). This feature can be introduced in the following stages. 1) On Receipt of Material in Store and 2) During every operation of manufacturing order While first can be introduced immediately after GRN process, the second option can be introduced only after building the features like Routing operation, and followed by "Production Entry to Work Order and Movement". Inspection after Receipt of Material in Store: In every industry, material inspection is an important activity which needs to be carried out at first while the material in dock and before the same is taken into stock for further consumption. In the current WebERP flow, once we receive the order the material directly gets into stock without any quality check. I can think through the following sequence of process for everyone to come out with their suggestions/inputs. 1) Introduce New Inspection Locations (to receive the material) using the Locations.php option (Inward, Main Store, Rejection, Rework, Scrap) 2) Develop a new Quality Control/Material Inspection Maintenance program a) Program will get the input as PO Number/ GRN No b) Display the material against the PO/GRN c) Provide the following options to Quality Inspector to classify the receipt qty based on their inspection. i. Received Qty, ii. Accepted Qty, iii. Rejected Qty, iv.Rework Qty, v. Scrap Qty d) Provide Comments Section to articulate the reason for the rejection/rework/scrap e) On Submission, move the accepted quantities to main warehouse respective location (which we need to specify in the item master, feature currently not available - needs to be confirmed) and other quantities to respective locations i.e. in case of scrap move to scrap location. f) Provide Option to Print the GIIR (Goods Inward & Inspection Report) 3) Develop the required consolidated reporting options like vendor wise rejection, item wise rejection reports for the date ranges. Let me know if you need any additional information in this regard. Regards, Muthu |