| Commit | Date | |
|---|---|---|
| 2008-02-08 15:52:13 | Tree | |
|
[r603]
by
grether
changes in structure of signalSystem and the controlstrategy types. furthermore introduced ids in matsimCommon as types. |
2008-02-08 15:43:00 | Tree |
|
[r602]
by
laemmel
|
2008-02-08 15:28:35 | Tree |
|
[r601]
by
ciarif
|
2008-02-08 15:24:04 | Tree |
|
[r600]
by
mrieser
Changes how departing vehicles are handled: They are now restricted to the same flow-capacity as other vehicles driving on that link. Before, it was possible that driving vehicles were not placed in the buffer because there was no flow-capacity left in this time-step, but vehicles departing (=in the waiting list) were still placed in the buffer, effectively enlarging the capacity of this link. This could lead to situations where more vehicles left a link that should have been possible according to the specified capacity. Added 2 Test Cases to ensure this behaviour in the future, and adapted three test cases to this new traffic flow. |
2008-02-08 14:55:41 | Tree |
| 2008-02-08 13:58:04 | Tree | |
| 2008-02-08 13:16:26 | Tree | |
| 2008-02-08 12:13:57 | Tree | |
| 2008-02-08 12:05:57 | Tree | |
| 2008-02-08 11:01:36 | Tree |