walk cost used to check if PT is better than walk now consistent with the cost used in scoring (as for the TransitRouter, the cost computation is hard-coded and only considers the (linear) cost of time in the "base" routing module)
Authored by: thibautd 2012-04-11
Parent: [r19085]
Child: [r19087]