| Commit | Date | |
|---|---|---|
|
[r18676]
by
fuerbas
|
2012-03-12 12:41:03 | Tree |
|
[r18675]
by
michaz
|
2012-03-12 12:22:45 | Tree |
|
[r18674]
by
fuerbas
|
2012-03-12 11:09:46 | Tree |
|
[r18673]
by
thibautd
bugfix: the departure time of park and ride considered for routing was always 00:00! |
2012-03-12 11:02:48 | Tree |
|
[r18672]
by
thibautd
application of tabu search to time and mode optimisation. "trip" routing is used. Using transit schedule to estimate pt travel times seems to lead to over-estimated travel times (or, at least, under-estimated plan score)... |
2012-03-12 10:44:14 | Tree |
| 2012-03-12 10:41:25 | Tree | |
| 2012-03-12 10:19:22 | Tree | |
|
[r18669]
by
thibautd
fix: there was an inconsistency between the wlk length in pnr (transfer walk) and pt-routing (search dist) at pnr interactions. Now PnR links have a length corresponding to the walk length. Stops list not used anymore. |
2012-03-12 10:03:10 | Tree |
| 2012-03-12 08:19:55 | Tree | |
| 2012-03-12 08:13:12 | Tree |