| Commit | Date | |
|---|---|---|
|
[r18672]
by
thibautd
application of tabu search to time and mode optimisation. "trip" routing is used. Using transit schedule to estimate pt travel times seems to lead to over-estimated travel times (or, at least, under-estimated plan score)... |
2012-03-12 10:44:14 | Tree |
| 2012-03-12 10:41:25 | Tree | |
| 2012-03-12 10:19:22 | Tree | |
|
[r18669]
by
thibautd
fix: there was an inconsistency between the wlk length in pnr (transfer walk) and pt-routing (search dist) at pnr interactions. Now PnR links have a length corresponding to the walk length. Stops list not used anymore. |
2012-03-12 10:03:10 | Tree |
| 2012-03-12 08:19:55 | Tree | |
| 2012-03-12 08:13:12 | Tree | |
| 2012-03-12 08:11:04 | Tree | |
| 2012-03-12 08:10:37 | Tree | |
|
[r18664]
by
yu_vsp
|
2012-03-09 21:40:04 | Tree |
| 2012-03-09 16:02:47 | Tree |