|
From: Drew R. <dr...@Da...> - 2016-06-27 16:54:35
|
Andy, They're in the "Tabs" item in the Geometry tab of the 2D Contour CAM operation. They may also be in other CAM operations but I haven't run into them yet. Drew On 6/27/16 8:56 AM, andy pugh wrote: > On 27 June 2016 at 15:28, Chris Kelley <ten...@gm...> wrote: >> I would say that the "proper answer" is to teach the users to properly use >> holding-tabs, hold-downs, etc > That reminds me, I used holding tabs a lot in CamBam, but haven't even > found them in Fusion360 or Inventor HSM. I wonder if they are there to > be found? > > However, to say that it is possible to never need to stop a job > part-way through to fix something is, I think, going a bit far. As I > recall the moveoff component was written after a request from a > commercial roll-machining company who wanted to be able to change > chipped or worn tips mid-job. > -- Drew Rogge dr...@da... Phone: 8934OOO629OO4829631OOOOOOO |