From SF Grid Integration Final CASE Report:
"The only compliance software changes required for HVAC Load Shifting in the 2022 code change cycle are to conform assumptions for pre-cooling times and temperatures with those specified for the proposed measure. The default values presented in Table 2 (of the SF Grid Integration Final CASE Report; attached) would be used in the calculation. The derating factor shall be kept at 70%, as in the previous version."
Diff:
Updating based on progress.
Ruleset changes implemented 11/11/24 - in process of testing across all CZs
Precooling mods checked into SVN @ r2495 and subsequent executable bugs found during batch testing of these updates checked in @ r2499
Comparison of Old (v2022.3.1) vs. New (SVN) 2022 Precooling Flexibility updates included in following table. Negative #s indicate more energy use & positive report savings. Results represent an average of the 1StoryExample and 2StoryZonalExample models.