Menu

Tickets  Maximize  Restore

Showing results of 26

# Summary Milestone Status Owner Creator Created Updated Labels
26 Remove No Longer Used PreTimed mode 1.0 open Mark Gardinier 2014-02-07 2014-03-04  
25 Remove No Longer Used PreTimed mode 1.0 open Mark Gardinier 2014-02-07 2014-02-07  
24 Parameters on the Fly 1.0 open Mark Gardinier 2014-02-07 2014-02-07  
23 Live Intersection Testing: Exernal Mapping of channels to phases 1.0 open Mark Gardinier 2013-02-05 2013-02-05 SCOPE, GUI  
22 Live Intersection Testing: Manual Interval Advance 1.0 open Mark Gardinier 2013-02-05 2013-02-05 SCOPE, GUI  
21 Live Intersection Testing: Implement External Reset 1.0 open Mark Gardinier 2013-02-05 2013-02-05 SCOPE  
20 Live Intersection Testing: All pedestrian outputs must be red as default 1.0 open Mark Gardinier 2013-02-05 2013-02-05 SCOPE  
19 LIve Intersection Testing: 24v Latch must be set 1.0 pending Mark Gardinier 2013-02-05 2013-02-05 SCOPE  
18 Expand the NTCIP/SCOPE data passing 1.0 open Mark Gardinier 2012-11-30 2012-11-30 SCOPE, NTCIP  
17 Remote display of Pedestrian Walk/Don't Walk status 1.0 open Mark Gardinier 2012-11-30 2012-11-30 SCOPE, GUI  
16 Overlap Technology 1.0 open Mark Gardinier 2012-11-29 2012-11-29 SCOPE, GUI  
15 Allow remote modification of TS2 parameters. 1.0 open Mark Gardinier 2012-11-29 2012-11-29 SCOPE, GUI  
14 Consider Adding Remote Ring Control To SCOPE 1.0 open Mark Gardinier 2012-11-29 2012-11-29  
13 External modification of Ring Sequence Data 1.0 open Mark Gardinier 2012-11-29 2012-11-29 SCOPE, GUI  
12 Add remote Vehicle and Pedestrian detector alarms 1.0 open Mark Gardinier 2012-11-29 2012-11-29 SCOPE, GUI  
11 Remote Detector Reset 1.0 open Mark Gardinier 2012-11-29 2012-11-29 SCOPE, GUI  
10 Remote assign detectors to phases 1.0 open Mark Gardinier 2012-11-29 2012-11-29 SCOPE, GUI  
9 Remote Hold and Omit Phase Logic to SCOPE 1.0 open Mark Gardinier 2012-11-29 2012-11-29 SCOPE, GUI  
8 Red Clear, Yellow Change, Gap Adjustment on Per Phase Basis 1.0 open Mark Gardinier 2012-11-29 2012-11-29 SCOPE, GUI  
7 Add remote coordination to SCOPE 1.0 open Mark Gardinier 2012-11-29 2012-11-29 SCOPE  
6 Add daylight savings plan capablity to SCOPE 1.0 open Mark Gardinier 2012-11-29 2012-11-29 SCOPE  
5 Clearance Times not Propagated On GUI 1.0 open Mark Gardinier 2012-11-15 2012-11-15 GUI  
4 Timing Plans / Day Plans 1.0 open Mark Gardinier 2012-11-15 2012-11-29 SCOPE  
3 Limit input parameters to NEMA values 1.0 open Mark Gardinier 2012-11-15 2012-11-15 GUI  
2 Preemption Needs to be put back into SCOPE 1.0 open Mark Gardinier 2012-11-15 2012-11-15 SCOPE  
  • Ticket Number
  • Summary
  • Milestone
  • Status
  • Owner
  • Creator
  • Created
  • Updated
  • Labels
 
(applies to this page only)
1 2 > >> (Page 1 of 2)