Control board SW release : development
Control board SW release : development
Control board SW release : development
Control board SW release : development
Control board SW release : development
Control board SW release : development
Control board SW release : development
Control board SW release : development
Changes : PWR board : Split C3 and C7 (2x1µf instead of 2,2µf)
Added : Heater fans controller module
Changes : Box design addition : sticker base layout
Changes : PWR board : Change C3 and C7 footprints (1206 instead of 0805)
Added : Box sticker
Changes : Box update
Changes : PCBs update
Changes : Box updated (lcd window and knobs)
Changes : Box update, LCD window (no more glass)
Added : Box drawings
Changes : PWR board update (resistors changes)
Added : Box drawings
Added : Box drawings
Added : Controller board
Added : Box drawings
Added : Box drawings
Added : Box drawings
Added : Controller board
Added : Controller board
Added : Controller board
Added : Controller board
Added : Controller board
Added : Controller board
Added : Controller board
Added : Controller board
Added : Controller board
Added : Controller board
Power supply board design
Power supply board design
Changes : update drawing files
project creation
Power supply board design
project creation
project creation
project creation
project creation
Control board SW release : Pre-release version
Box update
Box update
Box update
PCB update
Release 1.0
Box development
Box development
Box development
Box development
Box development
Box creation
Update lcd A-type modifications
First working release (for tests)
First working release (for tests)
Initial release
Initial release
Project creation
Changes : PCB Release B
Initial release
Project creation
Project creation
Project creation
Project creation
Project creation
Project creation
Release 1.0
Changes : Heating module
Changes in SettingsFrame module :
Update PID with new calculation method for I and scaled values by Heat Cycle for I and D
Menus re-arrangement : Sub-menu for settings
Settings menu and frames configuration (SettingsFramesDefs.h)
Settings frame completed with addition of frames changes management
Added : Menu selection frame
Added : Temperature acquisition module
Changes : Complete base frame management and started heating control
Changes : Updated base frame :
Changes : Base Frame
Added : EEPROM reset to defaults at startup ifRC button is pressed for > 2s
Changes : EEPROM management
PCB layout completion
Update LCD constants with parenthesis to avoid errors
Interface board layout design ongoing
pcb drawing ongoing
Remove temporary files
Control board routing first step completed
Layout creation
Schematic update (move thermocouple interface to interface board)
Schematic creation
Project creation
Project creation
Added : Mechanical files for display older
Added : Mechanical files for board pods
Changes : - Lock added on display holder
Changes : - Lock 3mf file
Project creation