Interfacing Integrated Management System (IMS)
Interfacing’s Integrated Management System (IMS) is an AI-powered platform that unifies BPM, QMS, Document Control, and GRC into one platform. Organizations use IMS to model and automate processes, control documents, manage risks, and maintain regulatory compliance with full traceability and audit readiness.
Built for highly regulated sectors such as aerospace, life sciences, finance, and government, IMS provides real-time visibility, automated workflows, and AI-driven insights that improve quality and reduce operational risk. The platform is ISO 27001 certified and fully validated for 21 CFR Part 11, making it suitable for mission-critical environments requiring strong governance, security, and control. IMS also includes low-code automation, process mining, audit management, training tracking, CAPA workflows, and dashboards to help teams streamline operations and continuously improve. AI strengthens governance, improves accuracy, and reinforces regulatory control.
Learn more
InEight
InEight offers integrated project controls software built for capital construction. The modular platform is integrated to support flexible implementation and is architected for scalability. Purpose-built applications manage all project phases, from accurate pre-planning to predictable execution and completion. By connecting cost, schedule, contracts, and project information in one platform, teams gain real-time visibility and advanced analytics to make smarter decisions. Trusted by 850+ companies and used to manage over $1 trillion in projects worldwide, InEight supports industries including infrastructure, transportation, mining, water, power and renewables, nuclear, oil, gas, and chemical. With InEight, teams can improve project delivery, modernize operations, standardize best practices, manage budgets and forecasts, control scope changes, enhance collaboration, and gain the clarity to keep even the most complex capital projects on track.
Learn more
delta
Delta automatically calculates mine plan spatial compliance using actual topographical surveys and planned mining surfaces. Timely information and agility are the key in addressing spatial deviations from the mining plan. TIMining Delta aims to reduce deviations from the mining plan sequence based on actual surveys and planned surfaces or 3D plan solids. TIMining Delta automatically carries out spatial compliance calculations and outputs compliance solids to import in all major mine planning software. Spatial deviations are reduced with TIMining Delta thanks to the systematic monitoring of actual versus planned progress, in a matter of seconds. TIMining automatically calculates the spatial differences between the initial and final mine surveys and the mine plan for a given period, categorizing volumes and tonnages. It then generates exportable outputs for each of the plan compliance solids, supported by all commonly used mine planning software.
Learn more