Compare the Top Construction Scheduling Software in the UK as of September 2026 - Page 3

  • 1
    ScheduleLens

    ScheduleLens

    ScheduleLens

    ScheduleLens turns a construction programme into a forensic-quality analysis report without the desktop software, the training, or the consultancy wait. Upload a Primavera P6 (.xer / .xml), Microsoft Project (.mpp / .xml), or Asta Powerproject (.pp) file and ScheduleLens runs a DCMA 14-Point health check, critical-path and float analysis, logic and constraint audits, and — for two schedules — forensic delay analysis, then writes an AI executive narrative. Reports download as PDF with an Excel appendix. Files are deleted immediately after processing and are never used to train AI models. Built by an owner-side project director; priced per report from $29, or monthly plans from $79. Key features: Primavera P6, Microsoft Project, and Asta Powerproject support DCMA 14-Point schedule quality scoring Forensic delay analysis (two-schedule and multi-update comparison) Critical-path and float-path analysis AI-generated executive narrative
    Starting Price: $29/report
  • 2
    WIZZCAD

    WIZZCAD

    WIZZCAD

    The best of technology serving the Smart Building. A unique collaborative platform for the digital transformation of all your projects, from design to maintenance. Start your project well thanks to good information management, suitable, complete and ergonomic tools. Connect all the actors of your construction projects around powerful site monitoring tools. Pilot and master operation and maintenance of your buildings thanks to a real decision-making tool. Optimize the monitoring of your work sites in the busy environment and interact with the occupants. WIZZCAD supports construction and real estate players in their digital transformation to help them build quality projects, safely, respecting deadlines and the budget. Import and manage all documents of a project, regardless of its format: technical, administrative, financial, legal documents, images, 2D plans, 3D models.