Download Latest Version profile_BPMN_20140804.zip (650.7 kB)
Email in envelope

Get an email when there's a new version of SINVAS

Home / UserGuide / SINVAS TEST
Name Modified Size InfoDownloads / Week
Parent folder
SINVAS STATIC TEST 2017-03-31
SINVAS DYNAMIC TEST 2017-03-31
README_SINVASTEST(DYNAMIC).txt 2015-12-31 9.8 kB
Totals: 3 Items   9.8 kB 0
================================
SINVAS DYNAMIC TEST must be executed.
================================

<<Prerequisite for SINVAS DYNAMIC TEST>>

1. JDK(x86) or JRE(x86) must be installed for executing SINVAS DYNAMIC TEST.
   (* Java6 later version is required.
    * 32bit version of JDK or JRE must be installed unconditionally.)

2. JAVA_HOME or JRE_HOME environment variable must be assigned.
   If the variables are not exist, you have to set properly.

   - Add [JAVA_HOME] environment variable to [Computer > Property > Advanced > Environment Variable]
     ex) JAVA_HOME=C:\Program Files\Java\jdk1.x

3. Also, you have to add file pathes to [Path] environment variable.
   - C:\Program Files (x86)\Java\jdk1.x\bin;
   - C:\Program Files (x86)\Java\jre1.x\bin;
   - C:\Program Files (x86)\Java\jdk1.x\jre\bin\client;
     or C:\Program Files (x86)\Java\jdk1.x\jre\bin\client;

4. Execute SINVAS DYNAMIC TEST installer on your PC.

5. You have to install 'Visual C++ Redistributable Packages for Visual Studio 2013' for executing SINVAS DYNAMIC TEST

6. After above-mentioned files are installed perfectly, you have to execute SINVAS DYNAMIC TEST.
	
* JDK or JRE is always needed to run the SINVAS DYNAMIC TEST.
* Teamserver must be executed for running SINVAS DYNAMIC TEST. Please refer to the User-Guide of SINVAS DYNAMIC TEST.

================================
Change logs
================================

<<The changes on December 30, 2015>>

1. Major updates
- The structure of test-models is changed.
  : Test-models, test-scenarios and test-cases can be added on the test-models. 
  : Test-scenarios and test-cases can be added on the test-scenarios.
- Test-scenarios can be generated based on Use-case scenarios.  
  : Use-case scenarios are converted into not test-scenarios but test-models. 
  : Use-case scenarios are converted into not test-cases but test-scenarios. 
  : Use-case scenarios can be selected to generated test-models. 

2. Bug fixes
- Other bugs are also fixed. 

------------------------------------------------------------------------------------------------------------------------------

<<The changes on November 3, 2015>>

1. Bug fixes
- The bug in properties-editor is fixed.
- The crash that Project is opened is fixed.
- Other bugs are also fixed. 

------------------------------------------------------------------------------------------------------------------------------

<<The changes on October 31, 2015>>

1. Minor updates
- Test Scenario can be generated based on UseCase Scenario. 

2. Bug fixes
- The project information is shown on the title.
- The style toolbar is removed.
- The function, Excel import/export, is improved.
- Constraints for editing data is added. 
- Constraints for vitalizing the function of recording is changed. 
- The scope of restriction by permission is expanded. 
- Is the authority processing the difference I want to be able to reflect the authority to matters not.
- To complement the authority of constraints outstanding matters
- To reflect the authority rice reflect matters right constraints
- The bug in script-editor is fixed. 
- Unnecessary options is deleted. 
- The action for key input is improved. 
- Other bugs are also fixed. 

------------------------------------------------------------------------------------------------------------------------------

<<The changes on October 8, 2015>>

1. Bug fixes
- The bug in web testing is fixed.

------------------------------------------------------------------------------------------------------------------------------

<<The changes on October 1, 2015>>

1. Major updates

The name of product is chaned. 
- SINVAS TEST => SINVAS DYNAMIC TEST

Team Collaboration
- The ¡®SNS Messaging¡¯ function is added. 

Traceability
- The traceability matrix is added. 
 * View the relation of traceability
 * Manage and set the relation of traceability easily and quickly

Test Engine
- The version of web test engine is upgraded. 
- The concept of variables of keyword-test is introduced. 

The version of JDK which supports SINVAS DYNAMIC TEST is changed. 
- Users must upgrade over a JDK ver.1.8.0(32bit)


2. Minor updates
- The function, checkpoints can be added in the recording controller, is added. 
- The function. information in Excel files can be imported or exported, is added. 
- The system of ID of test-scenario/test-case is changed. 


3. Bug fixes
- The bug of test-report is fixed. 
- Other bugs are fixed.

------------------------------------------------------------------------------------------------------------------------------

<<The changes on August 31, 2015>>

1. Major updates

Team Collaboration
- Data is managed only on the server, not as files.
- Users have constraints in SINVAS TEST based on their authorities.

Keyword based Test Design
- The usability of Keyword Editor is improved.
- SINVAS TEST executes tests based on keyword commands.
- THe CRUD of Keyword Editor is added.
- Items can be drag&drop
- The function for managing images is added. 

Record based Test Design
- The recording wizard is improved.
- The controller for test recording is added. 

Test Execution
- The controller for test execution is added. 

Test Management
- The structure of test projects is improved.
- UI for filling information of Test Scenario, Test Case and Test Step is added. 

Report Information
- UI for information sector of Scenario Test Result is added.
- UI for information sector of Integrated Test Result is added. 
- The function for documentation of outputs is added. 


2. Minor updates
- UI is improved. 
- Trace View is changed.


3. Bug fixes
- The bug of hangul information processing is fixed
- Other bugs are fixed. 

------------------------------------------------------------------------------------------------------------------------------

<<The changes on June 30, 2015>>

1. Major updates

Mobile Test
- Mobile testing  throug remote control of Android can be possible.
  (Support SAMSUNG mobile devices using SideSync 3.0)

Expand Test Engine 
- Compare texts of test target program
- Control window handle of test target program

Verify Test Case
- Verify Keword based Test Cases
- Verify Script based Tset Cases
- Define Verification Rules

Data based Test
- Support CSV data based testing 
- Support DB data based testing


2. Minor updates
Test Command
- Test Commands are added (Developer Reference)


3. Bug fixes
- The crash that Project Exploer Item is deleted is fixed.
- Waiting time of checkpoint command is complemented.
- Syntax Highlighting of Script based test case is fixed.
- Other bugs are fixed.

------------------------------------------------------------------------------------------------------------------------------

<<The changes on June 5, 2015>>

1. Major updates
- Update manual.

------------------------------------------------------------------------------------------------------------------------------

<<The changes on June 1, 2015>>

1. Bug fixes
- Bugs occured when test is restared in the Test Execution Controller is fixed.
- Bugs occured when test cases are deleted in the Project Explorer is fixed.

------------------------------------------------------------------------------------------------------------------------------

<<The changes on May 29, 2015>>

1. Major updates

Test Case Design
- Test cases can be designed based on modeling.
- The function for editing test diagrmas is added.

Test Execution
- Test execution can be controlled.

Recording
- Test recording can be controlled.

Test Command
- Sub-command of ¡®checkBy¡¯ is added.
- UTF-8 encoding processing is added.
- The function of file data loading is added.
- loop command is added.

2. Minor updates

Meta Model
- Notations of test cases are added.
- The relation of test flow is added.
- Other views are complemeted.

Others
- Images can be saved or deleted.
- Keyword based description and script based comment can be handling.
- The layouting of diagrams is added.

3. Bug fixes
- The crash when keyword based test cases are edited is fixed.
- jpg format image processing is fixed.
- Image processing of a transparent background is fixed.
- Syntax highlighting of annotations is fixed.
- Other bugs are fixed.

------------------------------------------------------------------------------------------------------------------------------

<<1st Release March 31, 2015>>

1.Feature(Dynamic Test)

Edit test scenario in various method
- Design and Edit keword based test scenario
- Design and Edit script based test scenario
- Generate test scenario supporting recording method
- Checkpoint in image-mapping method

Report
- Test Log View
- Viewer that shows test process visually
- Result of test process

2. Major updates

Keyword based editor
- Edit keword based test scenario
- Predictive keword input
- Set checkpoint
- Keword editor in grid form

Script based editor
- Edit script based test scenario
- Edit text easily

Report Log
- Reprot Log View
- Log for each case of test scenario
- Test Info.

Test Visualizer
- List of checkpoint mapping images in keword based test
- List of running images in keword based test
- List of running images in each log of report

Project explorer
- Search function for (keword based and script based)test scenario
- Search function for list of report

Properties
- Property editor for test scenario or list of report

Test Visualizer
- Image viewer of test scenario of list of report
Source: README_SINVASTEST(DYNAMIC).txt, updated 2015-12-31