Download Latest Version OpenConstructionERP_12.2.0_x64_en-US.msi (375.0 MB)
Email in envelope

Get an email when there's a new version of OpenConstructionERP

Home / v9.9.0
Name Modified Size InfoDownloads / Week
Parent folder
OpenConstructionERP_9.9.0_amd64.AppImage 2026-07-03 442.7 MB
OpenConstructionERP-9.9.0-1.x86_64.rpm 2026-07-03 363.5 MB
OpenConstructionERP_9.9.0_amd64.deb 2026-07-03 363.5 MB
OpenConstructionERP_9.9.0_x64-setup.exe 2026-07-03 329.9 MB
OpenConstructionERP_9.9.0_x64_en-US.msi 2026-07-03 355.0 MB
OpenConstructionERP_aarch64.app.tar.gz 2026-07-03 279.3 MB
OpenConstructionERP_9.9.0_aarch64.dmg 2026-07-03 280.3 MB
OpenConstructionERP v9.9.0 source code.tar.gz 2026-07-03 295.4 MB
OpenConstructionERP v9.9.0 source code.zip 2026-07-03 300.1 MB
README.md 2026-07-03 1.8 kB
Totals: 10 Items   3.0 GB 0

A features release. It adds Cost Explorer, a search-first workspace over the cost and resource databases. You can start from the resources you have, a material, a trade or a piece of plant, and find the priced work that uses them, ranked by how well each work is covered by what you named. You can search the catalogs for a work by description across every loaded price base, compare the same rate code across regional price bases side by side with a clear warning when the currencies differ, and substitute one resource inside a work to see the effect on its rate, with a read-out of where that resource is priced across your data. It is built on a resource-to-work reverse index over each cost item's resource composition that stays in sync as cost items change.

Added

  • Cost Explorer, a search-first workspace over the cost and resource databases, reachable from the sidebar under Cost Data.
  • By resources, find priced work from the materials, labour and plant it consumes, ranked by coverage with a per-work breakdown of what matched and what is missing.
  • Find work, search every loaded price base for a work by description.
  • Compare bases, the same rate code priced across regions side by side, with a warning when the regions price in different currencies so the amounts are not misread as directly comparable.
  • Substitute, re-price a single resource line inside a work and see the effect on the rate, with a read-out of where that resource is priced across the loaded bases.
  • The starter cost items shipped on a fresh install now carry resource recipes, so By resources and Substitute return real results out of the box before any regional catalogue is imported.
  • Translations for the Cost Explorer across all locales.

Full Changelog: https://github.com/datadrivenconstruction/OpenConstructionERP/compare/v9.8.0...v9.9.0

Source: README.md, updated 2026-07-03