| Name | Modified | Size | Downloads / Week |
|---|---|---|---|
| Parent folder | |||
| OpenConstructionERP_9.9.0_amd64.AppImage | 2026-07-03 | 442.7 MB | |
| OpenConstructionERP-9.9.0-1.x86_64.rpm | 2026-07-03 | 363.5 MB | |
| OpenConstructionERP_9.9.0_amd64.deb | 2026-07-03 | 363.5 MB | |
| OpenConstructionERP_9.9.0_x64-setup.exe | 2026-07-03 | 329.9 MB | |
| OpenConstructionERP_9.9.0_x64_en-US.msi | 2026-07-03 | 355.0 MB | |
| OpenConstructionERP_aarch64.app.tar.gz | 2026-07-03 | 279.3 MB | |
| OpenConstructionERP_9.9.0_aarch64.dmg | 2026-07-03 | 280.3 MB | |
| OpenConstructionERP v9.9.0 source code.tar.gz | 2026-07-03 | 295.4 MB | |
| OpenConstructionERP v9.9.0 source code.zip | 2026-07-03 | 300.1 MB | |
| README.md | 2026-07-03 | 1.8 kB | |
| Totals: 10 Items | 3.0 GB | 0 | |
A features release. It adds Cost Explorer, a search-first workspace over the cost and resource databases. You can start from the resources you have, a material, a trade or a piece of plant, and find the priced work that uses them, ranked by how well each work is covered by what you named. You can search the catalogs for a work by description across every loaded price base, compare the same rate code across regional price bases side by side with a clear warning when the currencies differ, and substitute one resource inside a work to see the effect on its rate, with a read-out of where that resource is priced across your data. It is built on a resource-to-work reverse index over each cost item's resource composition that stays in sync as cost items change.
Added
- Cost Explorer, a search-first workspace over the cost and resource databases, reachable from the sidebar under Cost Data.
- By resources, find priced work from the materials, labour and plant it consumes, ranked by coverage with a per-work breakdown of what matched and what is missing.
- Find work, search every loaded price base for a work by description.
- Compare bases, the same rate code priced across regions side by side, with a warning when the regions price in different currencies so the amounts are not misread as directly comparable.
- Substitute, re-price a single resource line inside a work and see the effect on the rate, with a read-out of where that resource is priced across the loaded bases.
- The starter cost items shipped on a fresh install now carry resource recipes, so By resources and Substitute return real results out of the box before any regional catalogue is imported.
- Translations for the Cost Explorer across all locales.
Full Changelog: https://github.com/datadrivenconstruction/OpenConstructionERP/compare/v9.8.0...v9.9.0