Download Latest Version OpenConstructionERP_12.2.0_x64_en-US.msi (375.0 MB)
Email in envelope

Get an email when there's a new version of OpenConstructionERP

Home / v9.6.0
Name Modified Size InfoDownloads / Week
Parent folder
OpenConstructionERP_9.6.0_amd64.AppImage 2026-07-01 444.6 MB
OpenConstructionERP-9.6.0-1.x86_64.rpm 2026-07-01 365.4 MB
OpenConstructionERP_9.6.0_amd64.deb 2026-07-01 365.4 MB
OpenConstructionERP_9.6.0_x64-setup.exe 2026-07-01 331.8 MB
OpenConstructionERP_9.6.0_x64_en-US.msi 2026-07-01 356.9 MB
OpenConstructionERP_aarch64.app.tar.gz 2026-07-01 279.8 MB
OpenConstructionERP_9.6.0_aarch64.dmg 2026-07-01 280.8 MB
OpenConstructionERP v9.6.0 source code.tar.gz 2026-07-01 296.3 MB
OpenConstructionERP v9.6.0 source code.zip 2026-07-01 301.0 MB
README.md 2026-07-01 3.0 kB
Totals: 10 Items   3.0 GB 0

A change intelligence and 6D lifecycle release. Change Intelligence gains a contractual notice and time-bar register that tracks every claim and extension-of-time notice against the project's contract standard so an entitlement is not lost to a missed deadline, a cross-source register of who owes the next action, a change-driver Pareto that ranks change cost by cause and by responsible party, and a change run-rate with a burn-rate forecast. The 6D carbon module adds a whole-life dashboard that reports embodied and operational carbon by EN 15978 stage alongside ISO 15686-5 whole-life cost and computes both from your BIM model with a dry-run preview you accept or reject line by line. It also closes a cross-project read gap on shared saved views and tightens who may edit workspace-level ledger accounts.

Added

  • A contractual notice and time-bar register on the Change Intelligence page. It derives every open notice and response clock from the dates already on your change orders, variation notices and extension-of-time claims, applies the notice period for the project's contract standard (FIDIC, NEC, JCT, AIA, ConsensusDocs, or a standard-neutral fallback), classifies each clock as met, upcoming, due soon or overdue, and flags a required notice with no proof on file or a lapsed bar so an entitlement is not quietly lost.
  • A cross-source commitment register that consolidates open meeting action items, risk mitigation actions, change orders and RFIs and submittals awaiting a response into one owe-list, ranked overdue first, with per-owner load and per-source counts.
  • A change-driver Pareto that ranks the cost and count of change by originating cause and by responsible party, with a running cumulative percentage, a per-currency split and a month-over-month trend.
  • A change run-rate that tracks the cumulative approved and pending change value against the contract over time, reports the intake rate, and projects a simple linear burn-rate forecast of the final change percentage at completion.
  • A 6D whole-life dashboard in the carbon module. It reports embodied and operational carbon by EN 15978 stage (A, B including B6 operational, and C, with module D shown separately and never added to the total) alongside ISO 15686-5 whole-life cost, computes operational carbon and life-cycle cost from the BIM model behind a dry-run preview, and lets you accept or reject each computed line before it counts.

Fixed

  • A project-shared saved view could be read by a manager from another project by passing the view's own project id back to the read. The read now enforces project access, so only the owner, a member of the view's project or an admin can open a shared view definition.
  • Editing a workspace-level general-ledger account, one not tied to a single project, now requires the consolidated-ledger admin scope, matching how those accounts are created and seeded.

Full Changelog: https://github.com/datadrivenconstruction/OpenConstructionERP/compare/v9.4.0...v9.6.0