Download Latest Version OpenConstructionERP_12.2.0_x64_en-US.msi (375.0 MB)
Email in envelope

Get an email when there's a new version of OpenConstructionERP

Home / v8.6.0
Name Modified Size InfoDownloads / Week
Parent folder
OpenConstructionERP_8.6.0_amd64.AppImage 2026-06-19 352.0 MB
OpenConstructionERP-8.6.0-1.x86_64.rpm 2026-06-19 272.8 MB
OpenConstructionERP_8.6.0_amd64.deb 2026-06-19 272.8 MB
OpenConstructionERP_8.6.0_x64-setup.exe 2026-06-19 265.4 MB
OpenConstructionERP_8.6.0_x64_en-US.msi 2026-06-19 290.9 MB
OpenConstructionERP_aarch64.app.tar.gz 2026-06-19 205.8 MB
OpenConstructionERP_8.6.0_aarch64.dmg 2026-06-19 206.4 MB
OpenConstructionERP v8.6.0 source code.tar.gz 2026-06-19 292.1 MB
OpenConstructionERP v8.6.0 source code.zip 2026-06-19 296.2 MB
README.md 2026-06-19 1.6 kB
Totals: 10 Items   2.5 GB 0

Added

  • A data-driven estimating methodology engine. Instead of one fixed markup chain, a project can now follow a named methodology that you build and edit in the app: a typed bill-of-quantities hierarchy, analytical dimensions, named funding sources, and a cascade of markups that build on one another. Country and industry templates ship ready to install - including a Uzbekistan cascade and a railway breakdown that price construction machinery inside the SMR works base while keeping installed equipment as a separate base - and every methodology coexists with, and is switchable against, the existing international method. The cascade editor shows a live preview and reconciles its arithmetic against the server, so the figures you see are the figures that are stored.

Fixed

  • Construction machinery is now costed separately from installed equipment in the bill-of-quantities cost breakdown. A resource typed as machinery used to be folded into the equipment category, which understated the works base and overstated equipment for methodologies that price the two differently, such as the post-Soviet SMR convention used by the Uzbekistan and railway templates. The breakdown now reports a distinct Machinery category; a methodology that does not separate the two is unaffected.

Security

  • Updated the bundled DOMPurify, protobuf.js and tmp dependencies to their patched releases to clear known advisories. These are transitive build-time and runtime libraries and the update changes no behaviour.

Full Changelog: https://github.com/datadrivenconstruction/OpenConstructionERP/compare/v8.5.0...v8.6.0

Source: README.md, updated 2026-06-19