Download Latest Version OpenConstructionERP_12.2.0_x64_en-US.msi (375.0 MB)
Email in envelope

Get an email when there's a new version of OpenConstructionERP

Home / v11.15.0
Name Modified Size InfoDownloads / Week
Parent folder
OpenConstructionERP_11.15.0_amd64.AppImage 2026-07-18 460.9 MB
OpenConstructionERP-11.15.0-1.x86_64.rpm 2026-07-18 381.6 MB
OpenConstructionERP_11.15.0_amd64.deb 2026-07-18 381.6 MB
OpenConstructionERP_aarch64.app.tar.gz 2026-07-18 296.0 MB
OpenConstructionERP_11.15.0_aarch64.dmg 2026-07-18 297.1 MB
OpenConstructionERP_11.15.0_x64-setup.exe 2026-07-18 348.4 MB
OpenConstructionERP_11.15.0_x64_en-US.msi 2026-07-18 373.3 MB
OpenConstructionERP v11.15.0 source code.tar.gz 2026-07-18 307.7 MB
OpenConstructionERP v11.15.0 source code.zip 2026-07-18 313.2 MB
README.md 2026-07-18 759 Bytes
Totals: 10 Items   3.2 GB 0

Every file and model viewer can now match a selected element straight to a priced cost position. Open the BIM viewer, the PDF takeoff or the DWG takeoff, pick an element, and the viewer reads that element's own properties, searches every cost catalogue you have loaded and ranks the positions that fit. Accept one and it creates a priced BOQ line for that element in the target bill and links it back to the element in a single step, so the quantity and the price travel together. This used to work only in the BIM viewer. It is now one shared panel across all of them, and it reuses the existing matching service, so there is no database change.

Full Changelog: https://github.com/datadrivenconstruction/OpenConstructionERP/compare/v11.14.0...v11.15.0

Source: README.md, updated 2026-07-18