Non-linear Music System Icon

Non-linear Music System

prealpha
0 Downloads (This Week)
Last Update:

Description

This project is to become a collection of code and software involving a non-linear and cell-based music system. The main objective is to provide tools for game and music designers for creating and playing non-linear music.

Non-linear Music System Web Site

KEEP ME UPDATED

Additional Project Details

Languages

English

Intended Audience

Developers, Other Audience

Programming Language

C

Registered

2011-01-31

Thanks for helping keep SourceForge clean.

Screenshot instructions:
Windows
Mac
Red Hat Linux   Ubuntu

Click URL instructions:
Right-click on ad, choose "Copy Link", then paste here →
(This may not be possible with some types of ads)

More information about our ad policies
X

Briefly describe the problem (required):

Upload screenshot of ad (required):
Select a file, or drag & drop file here.

Please provide the ad click URL, if possible:

Get latest updates about Open Source Projects, Conferences and News.

Sign up for the SourceForge newsletter:

No, thanks