Download Latest Version workspace.zip (38.0 MB)
Email in envelope

Get an email when there's a new version of MMACmodeler

Home / MMACDyanmicModeler
Name Modified Size InfoDownloads / Week
Parent folder
MMACdynamic_avec_lien.rar 2011-09-11 434.6 kB
README.txt 2011-08-22 594 Bytes
MMACDyanmicModeler.rar 2011-08-22 430.6 kB
Process(BPMN).rar 2011-06-30 698.1 kB
Totals: 4 Items   1.6 MB 0
Update brings dynamic link with MMAC. It allows adding, modifing, and deleting nodes dynamically. To link a dynamic and static editor, simply make sure both files have the same name.
-----------------
Available nodes :
-Activity
-Gateway
-Start (event)
-End (event)

Available link:
-Message (between pools)
-sequence

Compartment:
-Pool

This is based on BPMN.

To install, download MMACDyanmicModeler.rar, then simply copy all the .jar files in the dropins folder of your favorite eclipse distribution.
Then create a new document (CTRL + N) and search for "Process Diagram".
Source: README.txt, updated 2011-08-22