From: Tony B. <tb...@gm...> - 2006-04-05 17:52:42
|
Sorry if this has already been decided upon but I haven't been made aware o= f it so here goes. I have been looking at these as I'm sure some or all of you have as well. I think we can work with these to build our base from source and then expan= d on them in the future. There were a few of us on irc last night chatting about it. This is how I think we should move forward with this: 1 - as a group, decide on all the packages for both std vl and soho before we start 2 - 1 person designated to build the bare minimum base(a/ap/d/l/k source trees) - probably either myself or Uel or anyone that wants to take ownership of this task - all base build scripts need to be corrected for arch,flags,etc 3 - once the base is built, each developer is given a source tree or trees and they work on those on top of the base(vlbase.tgz).eg. kde,xap,etc - all packages must be built on a virgin base except for soho - 2 groups are needed here - std and soho and there will be some duplication as std and soho should be treated as separate distros - all build scripts need to corrected for arch,flags,etc 4 - we need to come up with SlackBuilds for the packages we include that aren't in slack and split this up depending on how many pkgs there are 5 - upload all the built packages to the respective trees and each of us install them for testing. 6 - once testing is completed, we package these up for the cd into vl-base.tgz,vl-std.tgz, and vl-soho.tgz - all X and related packages should reside in vl-std.tgz and vl-soho.tgz so that SOHO can be KDE only and have all packages built for it using kde as a dep. 7 - release beta std and soho at the same time 8 - set a beta test schedule of 2 weeks 9 - fix and release rc 10 - set an rc test schedule of 2 weeks and repeat 9 and 10 until stable. 11 - release final std and soho at the same time. 12 - designate a dev for each versions - std and soho - whose primary responsibility will be security patching 13 - start working on extra packages for the repo 14 - once there is a large repo of apps available, start the next cycle at step 1 Let me know what you all think. Having this process more organized and coordinated will allow us to work quicker and more efficiently giving us more time to create the extra app repo that is needed to take VL to the nex= t level. That way when Robert becomes rich from VL, he will share with all of us - lol. Regards, Tony |