eergy supply susbtituted
Technology EE
Text and spelling issues - labels, etc
check box for load profiles
optional input if 'others' was selected
telefone number - registration
sender of registration
automated titles/naming - Equipment supplier=Debtor?
Text and spelling issues - labels, etc
reset resultid after submission
Error when saving the forms
solved
submitting stage 2
There is just one account with the same domain allowed
Disclaimer and Terms of Use: access to text
NACE list - Activity sub-group list
Description of items of stage 2 of proposal submission
Fiscal ID number describtion wrong
AEE Logo drwan
Promoter link
Wrong titles for the proposal information
Dislcaimer and Terms of Use - content
dependant dropdown list
implementation of a debugging procedure
implementation of a debugging procedure
tests are continouasly implemented
Technology schemes
https://trustee-gitlab.ise.fraunhofer.de/trustee/trustee-platform/issues/55
buffer view while model is running
55
sender of registration
stage 1 submitting
Stage 1 - information on substituted energy
eergy supply susbtituted
Technology EE
internal server error when saving forms
internal server error when saving forms
Description of items of stage 2 of proposal submission
Spelling issues
to be revised after versionized saving of proposals is done. celery database will not be permanently -> results stored in Kotti database
default value corporate tax
discussed with Andrea and implemented in backend
sites per country
Does this problem still occur?
responsive design - content does not fit at the page
Titel Contact Person
Welcome Mail text
Mobile Phone Number required
Fiscal ID number describtion wrong
AEE Logo drwan
Error at Loadprofile after submitting
waste types
buffer view while model is running
input missing
Some Points from end user -> operating contitions tranfer
Comments to the biogas platform
Edit Biomass - Biomass boiler efficiency
Type of technology
heat production costs
Biogas_Operating hours: User_input missing.
Edit Biomass - Biomass type
Edit Biomass - LCV of the Biomass
not included of a MVP
Monitoring
standardize number formatting
Edit Biomass -amount of biomass
gitlab #119
Repeat e-mail address
Contact Person
when changed, don't forget conversion in backend !!
Edit Biomass -amount of biomass
Type of technology
heat production costs
Edit Biomass - Biomass boiler efficiency
We would suggest to make the field visible. Best, Anna
Dear Fanny, Sorry, I must have expressed myself badly but I utterly desagree with you. On the one hand, we are talking about an additional income for waste management not a cost, (the cost for waste management or transport is not the problem at all) on the other hand, as long as waste management income is indeed the core business of some biogas installations, in those cases the additional income for waste management exceeds by far the operating costs, so introducing in the current input box " Estimated...
Thank you for this feedback. We once discussed if we may add a field to query the operating hours as well and validate them so I added a placeholder (hidden field). Background: For solar the input is the profile (operating conditions) , as this is fixed to few options, it may no fit the assumptions of the user. I can either delete the alert or make the field visible. @Anna: what would you suggest?
test
Edit Biomass - Biomass type
Suggestion: Include additional yearly income input box for waste management in biogas projects.
These topics were discussed last summer and there was an agreement to have all technologies uniform in economic parameteres (and all other forms). Therefore it was decided to have annual costs which would already include such costs.
@ Fanny: We suggest you to include another input box in the economic paramenters for the biogas projects to introduce some additional income in the model in €/year as well. Since the technology is selected when creating a new plant on the platform, this input box could only appear in biogas examples, if this is technically practicable. LG Andrea
NACE list - Activity sub-group list
I have updated the list and added a few more options for for planners/equipment suppliers etc. You can find it in the files. Theres no special category e.g. for solar collector manufacturer or suppliers.
NACE list - Activity sub-group list
I just recognized that, that there is rarely a group for equipment suppliers, only 3 options in M71 Is this on purpose?
I guess you meant Current heat production costs instead of Current process heat related annual energy demand I changed it locally now and have to check with IT when they can merge into the online version
Edit Biomass - Biomass type
Suggestion: Include additional yearly income input box for waste management in biogas projects.
Biogas_Operating hours: User_input missing.
"The format of the investement cos is not very user friendly, because when you enter something, he makes your input automatically after the decimal place, wehn you don´t check twice you enter maybe 0.10 instead of 10.00” Please change this so that the decimal places have to be entered by the user itself as in all other input fields. The problem with the decimal places occurs at the following input parameters: Project Investments costs Project Development costs * Current process heat related annual...
Input means nothing it is only to reinforce the idea that the costs are an input for the user. Unitary energy costs means that the costs are divided by the total amount of energy in question. For example, we can have the annual energy costs but we can also have the annual energy costs divided by the annual energy consumption, and this is what we refer as unitary energy costs, i.e., are the energy costs per unit of energy, and this is what trustEE platform requires to the user. 2018-03-06 17:21 GMT+00:00...
what are input and unitary costs?