Schedule employee with 1 duty a day
Brought to you by:
kasreyn
I like to set instead of the hours in the horizontal part in the TimeScheduleControl the days.
Instead of the days I like to set the employees. But I think that is already possible.
As A summary I like the same functionallity to the horizontal tab like the vertical tab.
Thanks!