I only recently started using TU. And I really like it. So far, my one problem is with completed tasks. I have a total of 21. But 16 of those also show up in my overdue list, with lines through them and checked as completed. Is there a way to get rid of those in the overdue list?
If you would like to refer to this comment somewhere else in this project, copy and paste the following link:
I only recently started using TU. And I really like it. So far, my one problem is with completed tasks. I have a total of 21. But 16 of those also show up in my overdue list, with lines through them and checked as completed. Is there a way to get rid of those in the overdue list?
Never mind. Found the check box.