force control for triaxial compression; not converge all the way
now works for force control hydrostatic loading
triaxial test running
updating parameters
60MPa confining stress on Smoke Jumper soil
input parameters reset for 60MPa confining stress
adding missing input file
adding hydrostatic_2 -- force controlled hydrostatic test
adding hydrostatic_1 -- displacement controlled hydrostatic test
update, triaxial test running displacement controlled