<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>Recent changes to Searchlight_Signal</title><link>https://sourceforge.net/p/searchlight2/wiki4/Searchlight_Signal/</link><description>Recent changes to Searchlight_Signal</description><atom:link href="https://sourceforge.net/p/searchlight2/wiki4/Searchlight_Signal/feed" rel="self"/><language>en</language><lastBuildDate>Tue, 20 May 2014 02:00:00 -0000</lastBuildDate><atom:link href="https://sourceforge.net/p/searchlight2/wiki4/Searchlight_Signal/feed" rel="self" type="application/rss+xml"/><item><title>Searchlight_Signal modified by TwinDad</title><link>https://sourceforge.net/p/searchlight2/wiki4/Searchlight_Signal/</link><description>&lt;div class="markdown_content"&gt;&lt;pre&gt;--- v2
+++ v3
@@ -23,17 +23,7 @@

 ## Prototype System

-As an initial prototype, proof-of-concept, a simple logic board (using 7400-series logic) will be developed to control the dwarf signals on the staging side of the layout. 
-
-[ none | 600px](Image:YardSchem.png_) 
-
-In the above drawing, the lines represent tracks. Turnouts are numbered 1-8, and signals are designated with letters A-M (omitting "I"). The tracks marked (EM) and (WM) are the main lines entering the yard, and the tracks marked (ES) and (WS) lead to off-layout staging. 
-
-For the prototype, each signal location (A-M) will have a 2-color-light (green/red) dwarf signal installed so as to be visible from a train approaching the associated turnout. Signal aspects will be derived from logic based on the selected turnout positions. 
-
-Because at the current stage of layout development all turnouts are under manual control - and to simplify the design of the controller, turnout positions will be indicated by a set of DIP switches on the logic board. This requires that the operator throw TWO switches - the actual turnout switch on the layout and the corresponding DIP switch on the control board - in order to properly set the signals. This is admittedly error-prone. Future versions of the controller will incorporate automatic turnout position sensing, eliminating this dependency. 
-
-Track occupancy detection will not be implemented on the prototype system. 
+As an initial prototype, proof-of-concept, a simple logic board (using 7400-series logic) will be developed to control the dwarf signals on the staging side of the layout. Details on the prototype are on the [SLSignal_Prototype] page. 

 ## Dwarf Signal

&lt;/pre&gt;
&lt;/div&gt;</description><dc:creator xmlns:dc="http://purl.org/dc/elements/1.1/">TwinDad</dc:creator><pubDate>Tue, 20 May 2014 02:00:00 -0000</pubDate><guid>https://sourceforge.netbd94af0be204f2e02883db9104daa7c881d2ad8e</guid></item><item><title>Searchlight_Signal modified by TwinDad</title><link>https://sourceforge.net/p/searchlight2/wiki4/Searchlight_Signal/</link><description>&lt;div class="markdown_content"&gt;&lt;pre&gt;--- v1
+++ v2
@@ -25,6 +25,20 @@

 As an initial prototype, proof-of-concept, a simple logic board (using 7400-series logic) will be developed to control the dwarf signals on the staging side of the layout. 

+[ none | 600px](Image:YardSchem.png_) 
+
+In the above drawing, the lines represent tracks. Turnouts are numbered 1-8, and signals are designated with letters A-M (omitting "I"). The tracks marked (EM) and (WM) are the main lines entering the yard, and the tracks marked (ES) and (WS) lead to off-layout staging. 
+
+For the prototype, each signal location (A-M) will have a 2-color-light (green/red) dwarf signal installed so as to be visible from a train approaching the associated turnout. Signal aspects will be derived from logic based on the selected turnout positions. 
+
+Because at the current stage of layout development all turnouts are under manual control - and to simplify the design of the controller, turnout positions will be indicated by a set of DIP switches on the logic board. This requires that the operator throw TWO switches - the actual turnout switch on the layout and the corresponding DIP switch on the control board - in order to properly set the signals. This is admittedly error-prone. Future versions of the controller will incorporate automatic turnout position sensing, eliminating this dependency. 
+
+Track occupancy detection will not be implemented on the prototype system. 
+
 ## Dwarf Signal

+For signal indication, the prototype system (and the eventual final system) will use scratchbuilt LED-based 2-color-light dwarf signals. These will be based on the [Union Switch &amp;amp; Signal N2 dwarf signal](http://www.ansaldo-sts.com/EN/AnsaldoSTS/private/private_files/catalog/RSE_7B3_N2_N2S_Sig.pdf). 
+
+These dwarf signals will be constructed using 1.5mm SMT green and red LEDs, and styrene. The LEDs will be connected in a common Anode form, with three wires (Anode, Green Cathode, Red Cathode) leading to the controller. 
+
 ## Discussion / Rationale
&lt;/pre&gt;
&lt;/div&gt;</description><dc:creator xmlns:dc="http://purl.org/dc/elements/1.1/">TwinDad</dc:creator><pubDate>Tue, 20 May 2014 02:00:00 -0000</pubDate><guid>https://sourceforge.net5990baa2afe9f29212d9181b0ab891c1a0e1d2bb</guid></item><item><title>Searchlight_Signal modified by TwinDad</title><link>https://sourceforge.net/p/searchlight2/wiki4/Searchlight_Signal/</link><description>&lt;div class="markdown_content"&gt;&lt;div class="toc"&gt;
&lt;ul&gt;
&lt;li&gt;&lt;a href="#searchlight-signal"&gt;Searchlight Signal&lt;/a&gt;&lt;ul&gt;
&lt;li&gt;&lt;a href="#features"&gt;Features&lt;/a&gt;&lt;/li&gt;
&lt;li&gt;&lt;a href="#block-diagram"&gt;Block Diagram&lt;/a&gt;&lt;/li&gt;
&lt;li&gt;&lt;a href="#prototype-system"&gt;Prototype System&lt;/a&gt;&lt;/li&gt;
&lt;li&gt;&lt;a href="#dwarf-signal"&gt;Dwarf Signal&lt;/a&gt;&lt;/li&gt;
&lt;li&gt;&lt;a href="#discussion-rationale"&gt;Discussion / Rationale&lt;/a&gt;&lt;/li&gt;
&lt;/ul&gt;
&lt;/li&gt;
&lt;/ul&gt;
&lt;/div&gt;
&lt;h1 id="searchlight-signal"&gt;Searchlight Signal&lt;/h1&gt;
&lt;p&gt;Searchlight Signal is a project to develop a custom microcontroller-based logic system to manage the signals on my N scale layout. There are two complex "interlocking plant" areas, and a smattering of other signal locations around the design. &lt;/p&gt;
&lt;p&gt;The project will provide interlocking control logic for the LED signal heads, based on switch positions, track occupancy, and user (dispatcher) input. The module will (eventually) include OpenLCB connectivity &lt;/p&gt;
&lt;h2 id="features"&gt;Features&lt;/h2&gt;
&lt;ul&gt;
&lt;li&gt;Drives G/Y/R LED searchlight-style signal heads &lt;/li&gt;
&lt;li&gt;Drives multi-head, multi-light G/Y/R color light signals &lt;/li&gt;
&lt;li&gt;Accepts turnout position indication from Tam Valley Depot Quad Controllers &lt;/li&gt;
&lt;li&gt;OpenLCB and/or LocoNet and/or DCC control &lt;/li&gt;
&lt;li&gt;Implements logic specific to the layout track diagram &lt;/li&gt;
&lt;li&gt;Programmable &lt;/li&gt;
&lt;/ul&gt;
&lt;h2 id="block-diagram"&gt;Block Diagram&lt;/h2&gt;
&lt;p&gt;This is an initial concept block diagram. Subject to frequent and radical change. &lt;/p&gt;
&lt;p&gt;(ToDO: Add Block diagram) &lt;/p&gt;
&lt;h2 id="prototype-system"&gt;Prototype System&lt;/h2&gt;
&lt;p&gt;As an initial prototype, proof-of-concept, a simple logic board (using 7400-series logic) will be developed to control the dwarf signals on the staging side of the layout. &lt;/p&gt;
&lt;h2 id="dwarf-signal"&gt;Dwarf Signal&lt;/h2&gt;
&lt;h2 id="discussion-rationale"&gt;Discussion / Rationale&lt;/h2&gt;&lt;/div&gt;</description><dc:creator xmlns:dc="http://purl.org/dc/elements/1.1/">TwinDad</dc:creator><pubDate>Tue, 20 May 2014 02:00:00 -0000</pubDate><guid>https://sourceforge.netb831ac252239e916cf69f393cd05c95273db72d7</guid></item></channel></rss>