Method C "UPI and LPI" for Time
Brought to you by:
ken_raisor,
tuma
Hi:
UPI and LPI for PROBE A and B are introduced in Dashboard for PSP2.1. However, Step 6 of the PROBE Script allows a calcultion of upper (lower) time time based on the least (most) productive program when Method C is used.
It would be useful for Dashboard to calculate "UPI and LPI" when possible (two or more C data points available) when Method Cx is used for Time in PSP1.1x and 2.0. It would then be in compliance with Step 6 of the PROBE script.
Thanks for your consideration of this request.
rfrederi