Hi:

UPI and LPI for PROBE A and B are introduced in Dashboard for PSP2.1. However, Step 6 of the PROBE Script allows a calcultion of upper (lower) time time based on the least (most) productive program when Method C is used.

It would be useful for Dashboard to calculate "UPI and LPI" when possible (two or more C data points available) when Method Cx is used for Time in PSP1.1x and 2.0. It would then be in compliance with Step 6 of the PROBE script.

Thanks for your consideration of this request.

rfrederi