Menu

#65 Method C "UPI and LPI" for Time

open
nobody
None
5
2012-12-09
2011-03-26
rfrederi
No

Hi:

UPI and LPI for PROBE A and B are introduced in Dashboard for PSP2.1. However, Step 6 of the PROBE Script allows a calcultion of upper (lower) time time based on the least (most) productive program when Method C is used.

It would be useful for Dashboard to calculate "UPI and LPI" when possible (two or more C data points available) when Method Cx is used for Time in PSP1.1x and 2.0. It would then be in compliance with Step 6 of the PROBE script.

Thanks for your consideration of this request.

rfrederi

Discussion

Want the latest updates on software, tech news, and AI?
Get latest updates about software, tech news, and AI from SourceForge directly in your inbox once a month.