From: Arnie P. v. a. <we...@ma...> - 2010-02-01 02:53:12
|
Log Message: ----------- A few more changed to Reduced Credit documemtation Modified Files: -------------- webwork2/lib/WeBWorK: Constants.pm Revision Data ------------- Index: Constants.pm =================================================================== RCS file: /webwork/cvs/system/webwork2/lib/WeBWorK/Constants.pm,v retrieving revision 1.62 retrieving revision 1.63 diff -Llib/WeBWorK/Constants.pm -Llib/WeBWorK/Constants.pm -u -r1.62 -r1.63 --- lib/WeBWorK/Constants.pm +++ lib/WeBWorK/Constants.pm @@ -253,7 +253,7 @@ type => 'number'}, { var => 'pg{ansEvalDefaults}{reducedScoringPeriod}', doc => 'Length of Reduced Credit Period in minutes', - doc2 => 'The Reduced Credit Period is a period before the due date during which + doc2 => 'The Reduced Credit Period (formally called the Reduced Scoring Period) is a period before the due date during which all additional work done by the student counts at a reduced rate. Here is where you set the length of this period in minutes. If this value is greater than 0, a message like "This assignment has a Reduced Credit Period that begins 11/08/2009 @@ -267,7 +267,7 @@ type => 'number'}, { var => 'pg{ansEvalDefaults}{reducedScoringValue}', doc => 'Value of work done in Reduced Credit Period' , - doc2 => 'The Reduced Credit Period is a period before the due date during which + doc2 => 'The Reduced Credit Period (formally called the Reduced Scoring Period) is a period before the due date during which all additional work done by the student counts at a reduced rate. Here is where you set the reduced rate which must be a number in the interval [0,1]. 1 means no reduction. For example if this value is .5 and a student views a problem during the |