Menu

#66 Remove products from flow list when product system is calculated with allocation

Version_1.3.0
open
nobody
None
5
2013-01-22
2013-01-22
msrocka
No

This is an issue when there is a multi-output process in the product system, this process has no default allocation method defined, one of the output products is unlinked, and the system is calculated with a selected allocation method -> the unlinked product is treaded like an elementary flow with applied allocation factor and shown in the result list

Discussion


Log in to post a comment.