Add Metrics Disctribution
Brought to you by:
sauerf
Hi,
would it be possible to have the distribution of the
metrics beeing computed.
Like haeing (inside ecplise) the information that 25
classes have more than 150 LOC per method etc.
Some times it's greate to know that a class exceeded a
metric but it could be a more pertinent information to
know that 2/3 of project class exceeded the metrics. so
a redesign is needed.
Thanks.