From: Krzysztof K. <twe...@gm...> - 2011-09-02 14:44:48
|
2011/8/30 Diederik van Lierop <ma...@di...>: > - Can't this be done without having to convert each path to sbasis > first? Converting will take CPU time It's hard to do anything nontrivial in Bezier basis. In fact converting to SBasis, doing the operation in SBasis and then converting back could be faster than doing the operation in Bezier directly. Regards, Krzysztof |