John Eberhard
-
2021-06-09
- assigned_to: Zhang Ze
There was a previous ticket created for this, but I am still observing elapsed cpu percentage used discrepancy between JTOpen and the terminal. I noticed that the metrics for this is off by one decimal point. In one test I have observed:
The description in JTOpen docs just says: "Job attribute representing the percentage of processing time used during the elapsed time." - so I'm assuming this is a straightforward percentage value matching what is shown via WRKACTJOB.
Any clarification on this one?