Menu

Bugs  Maximize  Restore

Showing 7 results of 7

# Summary Milestone Status Owner Created Updated
14 ispezione (requisiti) PRE-RR_correction open Cesk 2011-01-13 2011-01-13  
13 metriche (requisiti) PRE-RR_correction open Cesk 2011-01-13 2011-01-13  
12 gestione di configurazione (requisiti) PRE-RR_correction open-rejected Cesk 2011-01-13 2011-01-14  
11 verifica caratteristiche collaudo PRE-RR_correction open deborah rizzi 2011-01-13 2011-01-13  
10 verifica caratteristiche programmazione PRE-RR_correction open deborah rizzi 2011-01-13 2011-01-13  
9 verifica caratteristiche progettazione PRE-RR_correction open Cesk 2011-01-13 2011-01-13  
6 correzione titolo + nuovo grafico gantt (nel nuovo 4.6) PRE-RR_correction open 2011-01-13 2011-01-13  
  • Ticket Number
  • Summary
  • Milestone
  • Status
  • Owner
  • Creator
  • Created
  • Updated
  • Labels
 
(applies to this page only)