My point was that engineers can not maintain a 2 metre distance. Which in these times is not good.
Maybe if the probe leads were included it would be ok.
If you would like to refer to this comment somewhere else in this project, copy and paste the following link:
Electrical engineers 2 meter distance.... not joking!
My Meters are too old to get a Virus - only one has a CPU the rest still use discrete logic or are analog :>)
As long as you wash them in hot water then they should be fine :*)
And consume Alcahol whilst using them.
My point was that engineers can not maintain a 2 metre distance. Which in these times is not good.
Maybe if the probe leads were included it would be ok.