(multi-threaded)
start workload(s) at time or when workload(s) finished
adjust connections
start on other workload stop
control run attributes (override)
allow scheduler to do actions based on workload stop with error / without error / or start
start/stop/wait/loop/terminate all
(run a workload, wait a while, wun a rowkload....)
If you would like to refer to this comment somewhere else in this project, copy and paste the following link:
(multi-threaded)
start workload(s) at time or when workload(s) finished
adjust connections
start on other workload stop
control run attributes (override)
allow scheduler to do actions based on workload stop with error / without error / or start
start/stop/wait/loop/terminate all
(run a workload, wait a while, wun a rowkload....)
modified, basically a bootstrap to create/load workloads and run them when defined
cron/timestamp/sequential