When logged into Project Server, gaps that I cannot explain appear in my schedules.
When connected to Project Server, it is possible for assignments on other projects to affect the schedule. To avoid this:
(1) Have only one project open in memory when you level resources.
(2) Uncheck "Load Summary Resource Assignments" in the Project Server Accounts dialog box when you log in.
This feature was formerly called "Connecting Across A WAN".
If you would like to refer to this comment somewhere else in this project, copy and paste the following link:
When logged into Project Server, gaps that I cannot explain appear in my schedules.
When connected to Project Server, it is possible for assignments on other projects to affect the schedule. To avoid this:
(1) Have only one project open in memory when you level resources.
(2) Uncheck "Load Summary Resource Assignments" in the Project Server Accounts dialog box when you log in.
This feature was formerly called "Connecting Across A WAN".