The wholesale power market design proposed by the U.S. Federal Energy Regulatory Commission (FERC) in an April 2003 white paper [FERC 2003] encompasses the following core features:

1. Central management by an independent market operator.
2. A two-settlement system consisting of a day-ahead market supported by a parallel real-time market to ensure continual balancing of supply and demand for power.
3. Management of grid congestion by means of locational marginal pricing (LMP), i.e., the pricing of power by the location and timing of its injection into, or withdrawal from, the transmission grid.
4. market power oversight and mitigation.

Project Activity

See All Activity >

Categories

Simulation

License

GNU General Public License version 2.0 (GPLv2)

Follow AMESProject

AMESProject Web Site

Other Useful Business Software
Gen AI apps are built with MongoDB Atlas Icon
Gen AI apps are built with MongoDB Atlas

Build gen AI apps with an all-in-one modern database: MongoDB Atlas

MongoDB Atlas provides built-in vector search and a flexible document model so developers can build, scale, and run gen AI apps without stitching together multiple databases. From LLM integration to semantic search, Atlas simplifies your AI architecture—and it’s free to get started.
Start Free
Rate This Project
Login To Rate This Project

User Reviews

Be the first to post a review of AMESProject!

Additional Project Details

Operating Systems

Linux, Mac, Windows

Intended Audience

Other Audience

User Interface

Java Swing

Programming Language

Java

Related Categories

Java Simulation Software

Registered

2012-09-24