I am trying to set up my DS209+ to run every 1st each month (to run a backup
from my other NAS).
So I configured:
Jan 1 at 9:55
Feb 1 at 9:55
Mar 1 at 9:55
and so on ...
But after saving the config, the DS shows that it will start on the august
15th at 0:00.
??? what is wrong
If you would like to refer to this comment somewhere else in this project, copy and paste the following link:
This is expected. Because the diskstation can be only programmed 7 days head,
the application will wake up the diskstation every 7 days to rearm the wakeup
timer.
If you would like to refer to this comment somewhere else in this project, copy and paste the following link:
the behavior is with your new version 2.3.4 still the same, the diskstation
starts every 7 days but will not shut down again.
mayby she would shutdown on the programed shutdown date 11:55 on the planed
date 1st of month ...
i tried to copy the logfile, but it is not possigble (win7, firfox15 or ie).
where can i find the logfile when i connect with ssh?
If you would like to refer to this comment somewhere else in this project, copy and paste the following link:
I am trying to set up my DS209+ to run every 1st each month (to run a backup
from my other NAS).
So I configured:
Jan 1 at 9:55
Feb 1 at 9:55
Mar 1 at 9:55
and so on ...
But after saving the config, the DS shows that it will start on the august
15th at 0:00.
??? what is wrong
This is expected. Because the diskstation can be only programmed 7 days head,
the application will wake up the diskstation every 7 days to rearm the wakeup
timer.
the behavior is with your new version 2.3.4 still the same, the diskstation
starts every 7 days but will not shut down again.
mayby she would shutdown on the programed shutdown date 11:55 on the planed
date 1st of month ...
i tried to copy the logfile, but it is not possigble (win7, firfox15 or ie).
where can i find the logfile when i connect with ssh?