Hello Victor
I feel the Rate Variance entry related to Libero Manufacturing is wrong in ADempiere. Assume one of the components standard price has reduced after 'Completing' MO. That means the PP_ORDER_COST shows the components previous standard cost in MO, while the M_Cost shows the current standard cost. In this case, I feel it should debit 'WIP' & credit 'Rate Variance' for the difference in rate. Instead of this, system is doing the other way.
Can you pls look into this. Pls see the attached Excel sheet.
Thanks
Johnson
rate variance : libero mfg
This issue was solve in this tracker 4 week before
https://sourceforge.net/tracker/?func=detail&atid=934929&aid=3469882&group_id=176962
kind regards
Victor Pérez
www.e-evolution.com
Hello Victor
Thanks.
Can I have the link to download the patch towards this so that I can apply, test and confirm the result.
Johnson