Showing 2 open source projects for "b-tree"

View related business solutions
  • Forever Free Full-Stack Observability | Grafana Cloud Icon
    Forever Free Full-Stack Observability | Grafana Cloud

    Our generous forever free tier includes the full platform, including the AI Assistant, for 3 users with 10k metrics, 50GB logs, and 50GB traces.

    Built on open standards like Prometheus and OpenTelemetry, Grafana Cloud includes Kubernetes Monitoring, Application Observability, Incident Response, plus the AI-powered Grafana Assistant. Get started with our generous free tier today.
    Create free account
  • AI-generated apps that pass security review Icon
    AI-generated apps that pass security review

    Stop waiting on engineering. Build production-ready internal tools with AI—on your company data, in your cloud.

    Retool lets you generate dashboards, admin panels, and workflows directly on your data. Type something like “Build me a revenue dashboard on my Stripe data” and get a working app with security, permissions, and compliance built in from day one. Whether on our cloud or self-hosted, create the internal software your team needs without compromising enterprise standards or control.
    Try Retool free
  • 1
    Scannt mehrseitige Dokumente (s/w)*speichert das Ergebnis als PDF in minimierter Dateigröße auf dem Desktop*Wandelt Bilddateien in PDF*Scans multipage documents (b/w)*saves the result as PDF in minimal filesize on the Desktop*Converts images to PDF
    Leader badge
    Downloads: 16 This Week
    Last Update:
    See Project
  • 2

    Taupical

    TALLA AUTOMÁTICA DE PIES PARA AJUSTE DE CALZADO

    ...Memoria final del proyecto, en el que se incluirá: a. Descripción de la tecnología utilizada y, en el caso de que no coincida con la establecida en la memoria preliminar, justificar el cambio. b. Descripción de los costes computacionales y requisitos tecnológicos. c. Manual de usuario del programa desarrollado. FASES 1. Entrega de la memoria preliminar (límite: 24 de febrero) (1 punto). 2. Entrega del ejecutable (4 puntos) y de la memoria final (3 puntos) (límite: 23 de mayo). 3. Presentación del trabajo (2 puntos) (28 de mayo).
    Downloads: 0 This Week
    Last Update:
    See Project
  • Previous
  • You're on page 1
  • Next
MongoDB Logo MongoDB