2 projects for "hpc" with 2 filters applied:

  • Custom VMs From 1 to 96 vCPUs With 99.95% Uptime Icon
    Custom VMs From 1 to 96 vCPUs With 99.95% Uptime

    General-purpose, compute-optimized, or GPU/TPU-accelerated. Built to your exact specs.

    Live migration and automatic failover keep workloads online through maintenance. One free e2-micro VM every month.
    Start Free
  • PRTG Catches Network Issues Before They Cause Downtime Icon
    PRTG Catches Network Issues Before They Cause Downtime

    Threshold-based alerts flag problems early, so your team can act before users notice, not after.

    Reactive troubleshooting usually means hearing about a problem from frustrated users, not your monitoring tool. PRTG sets threshold-based alerts across devices, servers and applications, notifying your team by email, SMS or push the moment a metric crosses a set limit. That means catching a failing disk or overloaded server before it becomes an outage and getting time back from firefighting. Start a free trial and set your first alerts today.
    Download 30-Day Trial
  • 1
    EECluster

    EECluster

    Tool for energy-efficient resource management in HPC clusters

    EECluster is software tool for managing the energy-efficient allocation of the cluster resources. EECluster uses a Hybrid Genetic Fuzzy System as the decision-making mechanism that elicits part of its rule base dependent on the cluster workload scenario, delivering good compliance with the administrator preferences. In the latest version, we leverage a more sophisticated and exhaustive model that covers a wider range of environmental aspects and balances service quality and power...
    Downloads: 0 This Week
    Last Update:
    See Project
  • 2
    minder

    minder

    Monitoring your infrastructure for free.

    This software presents a flexible and configurable proposal for monitoring and management of real and virtual HPC infrastructures, compatible with paradigm of cloud computing. We help you to answer: 1) What is the performance of my resources? 2) What equipment and resources do we have already? 3) What do we need to upgrade or repair? 4) What can we consolidate to reduce complexity or reduce energy use? 5) What resources would be better reused somewhere else?
    Downloads: 0 This Week
    Last Update:
    See Project
  • Previous
  • You're on page 1
  • Next