-
I try OP1.4 on 512 MB RAM, could you tell me How many size of memory for minimum and max param ?
Thanks
Janu.
2009-11-05 10:15:27 UTC in opentaps open source ERP+CRM
-
Hi Mark,
Thanks for your respond, could you explain more detail about :
What param that I must change ?
Is that = MEMIF= "-Xms 128M -Xmx 256M -XX=MaxPersSize=128M"
If that param that must be change, What param that will change ? and chnange to how many ?
Thanks
Janu.
2009-11-04 09:34:35 UTC in opentaps open source ERP+CRM
-
Hi,
I try Opentaps 1.4 on Ubuntu, installation with /ant run-install-seed.
Application run OK but mycompany data cannot load.
I login with user admin and psw ofbiz.
Create party, but cannot create that with error massage like this :
The Following Errors Occurred:
Data source error occurred while adding party group: The current transaction is marked for rollback, not beginning a new...
2009-11-03 10:04:56 UTC in opentaps open source ERP+CRM
-
I try Import data from .../opentaps/hot-deploy/mycompany/data/CompanyData.xml and that only 4.1 kb size.
The transaction not 2 hours but only 20 minute.
At the first installation the file on .../opentaps/hot-deploy/mycompany/data can not be load.
Before the installation I try to edit file to edit file ( I post in [here][1] ) to accomodated with my country.
Thanks janu
[1]...
2009-10-19 05:21:11 UTC in opentaps open source ERP+CRM
-
Hi,
I try to install OP 1.4 on Ubuntu 9.04 with PostgreSQL 8.3 and Java SDK 6.
Before install (ant run-install-seed) I change the data on .../hot-deploy/mycompany data after that I run the installation.
All installion running OK except data load on ..../hot-deploy/mycompany.
Than I try to use opentaps via http://localhost:8080/opentaps, everything is OK and than try to Import Data from...
2009-10-15 10:31:01 UTC in opentaps open source ERP+CRM
-
Hi,
I uses AD 253.a and try to test MRP and this is my setup.
Customer = A
Vendor = V
Product
1. A , Sold, BOM
2. B, Purchase, Child part from A
3. C, Purchase, Child part from A
Verify BOM = OK, product type = Component
MFG Resource
P Plant
Workflow
P WF with activity A/ P
Product Data Planning
Setup = OK
Try to make MO
Product = A
MFG...
2009-04-24 08:30:12 UTC in ADempiere ERP Business Suite
-
Hi,
I have problem with REQUISITION after ganered MRP.
The material requisition are issue but after I PROSCESS (prepared) the requisition process stop.
The next process required approved, but I can not approved.
I was actived the workflow like on the tutor in http://www.adempiere.com/wiki/index.php/How_to_Activate_Document_Approval_Workflow
but I still can not approved.
Any suggest how...
2009-04-08 06:03:40 UTC in ADempiere ERP Business Suite
-
Halo,
Saya sudah coba install AD353a, terinstall dengan sukses.
Saya coba untuk aplikasi khususnya mengenai MFG proses, karena modul tersebut yang akan banyak digunakan.
Saya coba dengan 2 alternatif sebagai berikut :
Trial 1.
Client : GardemWorld
Setup tambahan :
1. Product.
2. Bom
3. Resouces
4. Workflow
Proses MO berjalan dengan lancar dam MRP berjalan dengan sukses.
Trial...
2009-02-24 09:15:37 UTC in Starprise Indonesia ERP
-
I was setup AD 353 and try to setup new client.
I was setup product, resources, workflow like on user manual.
I try to make MO but if I save there a problem like this :
Action Invalid value - N - Reference_ID=302 - Z - C - F - V - W - X - T - R - P - D - M - B
Is there are wrong setup ?
How to make it work ?
Thanks
Janu.
2009-02-16 09:57:27 UTC in ADempiere ERP Business Suite