Home / version / plandora-v.1.13.0
Name Modified Size Downloads / Week Status
Parent folder
Totals: 7 Items   704.5 MB 129
Plandora_1_13_0@ubuntu-12_10-i386-VirtualBox.7z 2013-12-29 618.6 MB 44 weekly downloads
other_db_scrips_BETA.zip 2013-06-29 25.5 kB 44 weekly downloads
plandora-v1.13.0.zip 2013-06-29 42.8 MB 103103 weekly downloads
README 2013-06-29 3.8 kB 44 weekly downloads
plandora-source-v1.13.0.zip 2013-06-29 42.5 MB 77 weekly downloads
READ-ME_FOR_MIGRATION_FROM_v1.12.0.txt 2013-06-29 2.4 kB 33 weekly downloads
plandoraInterface.jar 2013-06-29 588.2 kB 44 weekly downloads
==> Bug - bug fix at CSV export from grid data. There was a bug when a cell contained values with 'line feed'. The csv was formated wrongly; - bug fix at Survey Form. There was a bug at 'paging' link. An undesired report was popup after each re-paging; - bug fix at popup form of Link Relation feature. The parent form was reloading in a blank page; - bug fix at iteration combo of 'All Requests' form; - bug fix at project form. The combo status was populated only with 'close' option after closing an arbitrary project and pressing the clear button (thanks to Tiago Picon); - bug fix at category form. The 'remove category' option was not working (thanks to Tiago Picon); - bug fix at relationship grid of Task Form (thanks to Juan Otth); - bug fix at used capacity calculation at Resource Capacity Form (thanks to Eduardo Milanez); - bug fix at "My Teams" DB query. There was a bug when the resource member was desalocated of all projects; - after executing a relationship action (task, occurrence, etc) the system creates a new link but shows a error message: "A relationship between this two entities already exists". The bug was fixed; - bug fix at MSProject import. The task name must be trucated. (thanks to Juan Otth); - gantt chart was showing an empty macro task if a resource members was selected (filter) and the macro task didn't contain tasks into it; - bug fix at Gantt Project exporting. The task name formating was not working appropriately. (thanks to Rocío E. Villalba); - bug fix at meta form grid object (adding a row); - bug fix at Task form. The 'is macro task' check box was saving with enabled status even when user set to disabled. - bug fix at expenses form. A expense item was editable even after changed to paid or cancelled. (thanks to Paola Tame); - the form of cost, invoices and expenses were not handling appropriately big values (thanks to Juan Otth); ==> Feature - an attribute 'is_mandatory' was included at meta_field. Now it is possible to define which meta_field have to be fill-in by user; - now the gantt chart shows the calendar events and milestones; - implementation of new agent to import JIRA issues to Plandora requests (including attachments); - adjust at workflow popup. Now it is displayed the description of related request and the follow-up of all comments typed by resorces during workflow life-cycle; - now the "Show All Tasks" form contains a filter by date (last updating task date); - implementation of procedure to import requests from CSV file; - now the company form contains new fields: address, city, state, etc; - performance tunning at 'Show All Tasks' and 'Show All Requests' Forms; - implementation of new agent "Report2File" to schedule a report execution and save at filesystem; - now, the report form and report2email agent can generate a Plandora report in JPG format; - now, the resource capacity form contains a filter to shows a comparison between estimated capacity and used capacity. Besides, it is possible to filter the resource capacity panel by zero/empty values; - now, the metafields of: task, requests and projects could be displayed at Main Form grids; - now, the request ID of a task is a editable field at 'All Tasks Form'; - now, it is possible filter the 'Iteration Burndown Gadget' chart by project category; - the 'removeItem' method was included at repository interface. The features was implemented only to DB Repository; - it was included the field 'smtp port' at the email notification agents; - now, the Plandora is able to open a JDBC connection directly ('bypassing' Tomcat connection polling). The default behaviour uses the Tomcat connection polling. Check web.xml file after Plandora deploy; - implementation of EDI form to export user data to RSS and ICAL formats.
Source: README, updated 2013-06-29