#126 Saving results of analysis

Feature
open
nobody
6
2013-03-16
2010-02-02
David Benn
No

A post phase 1 task is the saving of analysis results, e.g. phase plot, mean curves, and eventually, period analysis. But really, this involves saving a bunch of things:

o The originating raw data, or more likely a references to it: AUID, JD range
o Mean curve bin size for raw plot and phase plot
o phase plot epoch and period values

So, what do we save this as? XML?

Discussion

  • Sara Beck
    Sara Beck
    2010-03-03

    • milestone: 952180 --> Feature_-_Phase_2
     
  • David Benn
    David Benn
    2010-04-25

    • priority: 5 --> 9
     
  • David Benn
    David Benn
    2010-04-25

    This is an important item to be resolved.

     
  • David Benn
    David Benn
    2011-07-28

    • priority: 9 --> 6
     
  • David Benn
    David Benn
    2011-07-28

    We can now save obs, means, models/residuals which is probably at least as important as this "project I/O" issue. I would suggest that there are other items with higher priority, e.g. WWZ, so reducing the priority of this tracker.